Wednesday, Thursday & Friday,
Oct. 22nd - 24th
 
 

Mike goes in one more time to finish scraping the harbor bottom to it's destinated depth of 6 feet.  The waterfall pump in the black bucket keeps working at keeping the harbor dry (as possible) so the walls can be built easier.

The excavator heads onto the pile to tackle the job of smoothing out the mountain of mud.  More mud is on it's way! 
 
 
 
 
Poles for the lodge wall have begun to be set.
 
The sludge from the bottom was contained in fencing and hauled load by load up to the pile behind the playground.
 
 
 
 